We traded away half our interior finish budget on a steep Fribourg site just to keep the poured plinth from getting value-engineered into precast panels. Once you lose that real mass at the ground plane, the whole building never quite sits right.
Seeing real mass survive all the way down to the water is so satisfying. The texture on those pours against the river slope is gorgeous.
Getting that finish so clean right against the river slope is wild—did they cast it in stepped lifts to handle the water table, or manage a single continuous pour down the drop?
Comments