Did you rely entirely on the low absorption of the rough-split granite to protect the timber sill, or is there a concealed capillary break tucked into that top joint?
Did you end up detailing a ventilated gap between the granite and the timber posts, or is that top course shedding cleanly enough to bed them direct?
Comments